Back to Track Record

Roads & Infrastructure: Better Roads, Better Connectivity

Nearly 10 km of ward roads graded, gravelled and compacted, plus redesigned drainage along TAI Sacco Road.

Hon. Joseph Muhinja Kamau, working with the County Roads Department, has graded, gravelled, and compacted nearly 10 kilometres of ward roads and redesigned the drainage system along TAI Sacco Road to reduce flooding.

Roads upgraded through grading, gravelling, and compaction

In collaboration with the County Roads Department, five roads across Githunguri Ward have been upgraded through grading, gravelling, and compaction:

RoadDistance
Gathanji – Ikuria3.5 km
Kiairia – Gititu3 km
Gathigi – Kiangima2 km
Kigio – Kanjuku1 km
TAI Sacco – Total350 m

These five roads add up to nearly 10 kilometres of upgraded surface across the ward. Each road connects villages that previously relied on unimproved or seasonal-access routes.

Redesigned drainage along TAI Sacco Road

The drainage system along TAI Sacco Road has been redesigned to reduce flooding. Improved drainage protects the road surface from water damage and keeps the route passable during heavy rains.

Routine maintenance on rural access roads

Rural access roads across Githunguri Ward receive routine grading and maintenance. Ongoing maintenance keeps these roads usable between major upgrade projects and extends the lifespan of prior investments.

Gathigi Road: from hardcore to compaction

The Gathigi Road upgrade followed a full construction sequence. Hardcore stone was laid first to establish a stable base for the road.

Gravel was then spread across the Gathigi Road section ahead of compaction. The road was widened and graveled to improve capacity and safety for both vehicles and pedestrians.

A roller was used to compact the newly graveled surface. This final step produced a shaped, graveled, and compacted road ready for regular use.

Hardcore stone laid along the Gathigi Road during graveling worksGathigi Road section spread with gravel before compactionGraveled and shaped stretch of the Gathigi RoadWidened and graveled section of the Gathigi RoadCompleted graveled surface of the Gathigi RoadRoller compacting the newly graveled Gathigi Road
Graveling of the Gathigi Road — from hardcore laying to grading and compaction.

Why this investment matters for Githunguri Ward

  • Nearly 10 kilometres of graded, gravelled, and compacted roads improve access between villages and to Githunguri Town
  • Redesigned drainage along TAI Sacco Road reduces flooding and protects the road surface during heavy rains
  • Routine grading and maintenance on rural access roads keeps village connectivity reliable year-round
  • Improved roads reduce transport costs and travel time for farmers moving produce to market
  • Better road access supports emergency response, school access, and daily commerce across the ward

Frequently asked questions

How many kilometres of roads have been upgraded in Githunguri Ward?
Nearly 10 kilometres of ward roads have been graded, gravelled, and compacted, covering the Gathanji – Ikuria, Kiairia – Gititu, Gathigi – Kiangima, Kigio – Kanjuku, and TAI Sacco – Total roads.
Which road is the longest of the recent upgrades?
The Gathanji – Ikuria road is the longest of the recent upgrades, at 3.5 kilometres.
What was done to reduce flooding along TAI Sacco Road?
The drainage system along TAI Sacco Road has been redesigned to reduce flooding and protect the road surface.
Who is partnering with Hon. Muhinja on these road upgrades?
Hon. Muhinja is working with the County Roads Department to grade, gravel, and compact roads across Githunguri Ward.
What construction process was used on Gathigi Road?
Gathigi Road was upgraded by laying hardcore stone, spreading and shaping gravel, widening the road, and compacting the surface with a roller.
Are roads outside the five listed upgrades also maintained?
Yes. Rural access roads across the ward receive routine grading and maintenance in addition to the major upgrade projects.